< BackProject

Abovyan 5/5 Hotel (Multi Group)

An active project with systems being installed and configured, selected photos and the current scope of work.

Fire alarmEvacuation systemAccess controlElectric heated floors
Installation

Work is currently ongoing at this facility

The photos and work scope below reflect what is being installed or has already been completed within this project.

Get a commercial proposal
Stages
  1. 01Survey and design
  2. 02Supply
  3. 03InstallationActive
  4. 04Programming
  5. 05Handover
Project brief card

Problem -> Solution -> Result

We describe the facility in a clear format: problem, implemented solution and real result.

Problem

The facility required stable and controllable engineering systems for safe daily operations.

Solution

Implemented scope: Fire alarm / Evacuation system

Result

The project is in progress with phased installation and configuration according to facility operations.

Delivered works

What was implemented on site

The work list is below; the next section shows real photos of completed work on site.

Work 01

Fire alarm

Work 02

Evacuation system

Work 03

Access control

Work 04

Electric heated floors

System types

Reference visuals of installed system types

This block is informational and shows system types, not photos from the site. Real Smart Tech work photos are shown in the section above.

Prepared fire alarm call point
Prepared fire alarm call point
Door access control setup
Door access control setup
Electrical installation works
Electrical installation works

Want the same level of clarity for your facility?

Request a site survey and receive a step-by-step technical proposal with the right system package.

Request site survey